Precision provided estimating services at each phase of the design process, from conceptual and schematic to design development and bid-ready plans. One objective was to enhance non-motorized mobility, so a new asphalt-concrete multi-use trail was installed. To improve safety, a 3,000 LF soldier pile retaining wall located along the Santa Cruz Branch Line Railroad was constructed. Additional scopes included all requisite street and sidewalk improvements. This included off-site work at several intersections.
Location: Santa Cruz, California
Category: Parks & Recreation